Trade Permit Works

Windham

NH  Last verified: 2026-06-29  · Last crawled: 2026-06-25  · Confidence: 100%
Official town site
Permit required
A change from seasonal to full-time year-round residential structure conversion permit is required.
Fee range
LIST NEW CONSTRUCTION UP TO 3000 SQ FT: $100.00 OTHER EACH ADDITIONAL 1000 SQ FT: $20.00 ADDITIONS / REMODEL UP TO 800 SQ FT: $40.00 EACH ADDITIONAL 100 SQ FT: $10.00 MINIMUM FEE: $30.00
Processing time
5 days

All permit information

FieldValueConfidenceVerificationSource
Email Contact the town office directly high human_verified ✓
Permit forms https://windhamnh.gov/DocumentCenter/View/170/Year-Round-Conversion-Permit-PDF high human_verified ✓ source
Scheduling inspections Completed Evaluation and Certification Reports can be submitted to Keith Meile, Health Officer, via email (linked on top-right of this page) or delivered in person to the Community Development Department high human_verified ✓ source
Inspection scheduling method email, in person high human_verified ✓ source
Job type notes The Ordinance requires pumping and inspection every three years for properties within the WPOD boundaries high human_verified ✓ source
municipality_mailing_address 3 North Lowell Rd, Windham, NH 03087 high human_verified ✓
Office hours Monday - Friday: 8 a.m. - 4 p.m. high human_verified ✓ source
Permit office https://windhamnh.gov/556/WPOD-Septic-Pump-Out-and-Inspection high human_verified ✓ source
Permit types supported septic pump-out and inspection high human_verified ✓ source
Phone 603-965-1201 high human_verified ✓
Portal vendor Civic Plus medium human_verified ✓ source
Required notice window at least 24 hours high human_verified ✓ source
Suggest a correction Something wrong? Let us know.

Suggest a correction